Complete bathroom
An average bathroom of 5 m² takes us two weeks. Week one: stripping out, pipes, drains and the floor. Week two: tiling, sealing and connecting everything. Our own tiler has worked with us for eight years.
Small jobs
A toilet that keeps running, a thermostatic mixer that no longer mixes properly, a basin coming away from the wall. We usually schedule those within a week, or sooner if you’re a subscriber.




